Earl Grey Drive Extension – 2 Week Look Ahead Dec 22

December 19, 2025

diagram-arrow-down

We’d like to share the look ahead update for the Earl Grey Underpass project:

Construction

Anticipated construction activities over the next 2 weeks starting December 21st week

  • Stage 4 traffic remains in place along Terry Fox Drive
  • Continue installation of the shoring system for Terry Fox Drive overpass along westerly side of Terry Fox Drive
  • Continue the deep storm sewer works and preparation for rock excavation by blasting methods in future LRT extension corridor between Didsbury Road (west) to Didsbury Road (east).
  • Holiday period shutdown between December 24th to January 4th.

Traffic

The following are the current and upcoming traffic impacts for your community.

Lane Closures

Anticipated lane closures over the next 2 weeks, continuing the week of December 21st:

  • Stage 4 traffic configuration along Terry Fox Drive – two North-bound lanes open, two South-bound lanes open traffic between approximately Campeau Drive to Hwy 417 WBL exits i.e., no lane closures
  • Encroachment/flagging along Didsbury Road (east).

Pedestrian Detours

No impacts anticipated, north-bound cyclists and pedestrians along Terry Fox Drive are detoured to the temporary multi-use pathway along the East side of Terry Fox Drive.

OC Transpo Detours

No route impacts anticipated.  Temporary Bus Stops applied by OC Transpo along Terry Fox where necessary.

Other

  • Access to residents and business are being maintained
  • Ongoing discussions with the BIA
  • Schedule and Traffic impacts are subject to change and are subject to conditions such as weather, material/labour supply and availability, unforeseen items and conditions