We’d like to share the look ahead update for the Earl Grey Underpass project:
Construction
Anticipated construction activities over the next 2 weeks starting December 21st week
- Stage 4 traffic remains in place along Terry Fox Drive
- Continue installation of the shoring system for Terry Fox Drive overpass along westerly side of Terry Fox Drive
- Continue the deep storm sewer works and preparation for rock excavation by blasting methods in future LRT extension corridor between Didsbury Road (west) to Didsbury Road (east).
- Holiday period shutdown between December 24th to January 4th.
Traffic
The following are the current and upcoming traffic impacts for your community.
Lane Closures
Anticipated lane closures over the next 2 weeks, continuing the week of December 21st:
- Stage 4 traffic configuration along Terry Fox Drive – two North-bound lanes open, two South-bound lanes open traffic between approximately Campeau Drive to Hwy 417 WBL exits i.e., no lane closures
- Encroachment/flagging along Didsbury Road (east).
Pedestrian Detours
No impacts anticipated, north-bound cyclists and pedestrians along Terry Fox Drive are detoured to the temporary multi-use pathway along the East side of Terry Fox Drive.
OC Transpo Detours
No route impacts anticipated. Temporary Bus Stops applied by OC Transpo along Terry Fox where necessary.
Other
- Access to residents and business are being maintained
- Ongoing discussions with the BIA
- Schedule and Traffic impacts are subject to change and are subject to conditions such as weather, material/labour supply and availability, unforeseen items and conditions