Sharing the 2 Week Look Ahead update for the Earl Grey Drive Extension project.
Construction
Anticipated construction activities over the next 2 weeks starting May 25th week
- Stage 4 traffic remains in place along Terry Fox Drive, Lane closures for Terry Fox commence June 1st.
- Continue the storm sewer works along Didsbury Road (east) into Terry Fox Drive.
- Continue watermain installation along Didsbury Road (east).
- Continue Terry Fox south side stage 1 foundation works.
Traffic
The following are the current and upcoming traffic impacts for your community.
Lane Closures
Anticipated lane closures over the next 2 weeks, continuing the week of May 25th:
- Stage 4 traffic configuration along Terry Fox Drive – two North-bound lanes open, two South-bound lanes open traffic between approximately Campeau Drive to Hwy 417 WBL exits i.e., no lane closures until June 1st
- Terry Fox Lane Closures – One lane each direction commencing June 1st for approximately 2 weeks. Turning movement restrictions at the Intersection Didsbury EB left turn to Terry Fox NB from June 1st to June 8th. Turning movement restriction Terry Fox SB to Roland Michener EB from June 1st to June 15th.
- Roland Michener – 1 EB Left Turn Lane closed to Terry Fox SB from June 1st to June 15th.
- Encroachment/flagging as necessary, along Didsbury Road East
- Note: upcoming July 6th roadway closure for Didsbury Road East at Terry Fox Drive.
Pedestrian Detours
- No impacts anticipated, north-bound cyclists and pedestrians along Terry Fox Drive are detoured to the temporary multi-use pathway along the East side of Terry Fox Drive. Commencing June 1st throughout the Summer the crosswalks will be closed at Didsbury/Roland Michener at the Terry Fox intersection to the westerly side of Terry Fox Drive, easterly N/S crosswalk to remain open.
OC Transpo Detours
- No route impacts anticipated. Temporary Bus Stops applied by OC Transpo along Terry Fox where necessary. Both current bus stops will be temporarily relocated slightly northerly commencing June 1st.
Other
- Access to residents and business are being maintained
- Ongoing discussions with the BIA
- Schedule and Traffic impacts are subject to change and are subject to conditions such as weather, material/labour supply and availability, unforeseen items and conditions