Earl Grey Drive Extension – 2 Week Look Ahead Nov 24

November 21, 2025

diagram-arrow-down

Our team received the following 2 week look ahead update for the Earl Grey Underpass project:

Construction

Anticipated construction activities over the next 2 weeks starting November 24th week

  • Stage 4 traffic remains in place along Terry Fox Drive
  • Continue installation of the shoring system for Terry Fox Drive overpass along westerly side of Terry Fox Drive
  • Commence the deep storm sewer works and preparation for rock excavation by blasting methods in future LRT extension corridor between Didsbury Road (west) to Didsbury Road (east).

Traffic

The following are the current and upcoming traffic impacts for your community.

Lane Closures

Anticipated lane closures over the next 2 weeks, continuing the week of November 24th:

  • Stage 4 traffic configuration along Terry Fox Drive – two North-bound lanes open, two South-bound lane open traffic between approximately Campeau Drive to Hwy 417 WBL exits i.e., no lane closures
  • Encroachment/flagging along Didsbury Road (east and west) daytime works
  • Lane closure along Didsbury Road West near Roger Neilson Way commencing week of December 1st.

Pedestrian Detours

  • No impacts anticipated, north-bound cyclists and pedestrians along Terry Fox Drive are detoured to the temporary multi-use pathway along the East side of Terry Fox Drive.

OC Transpo Detours

  • No route impacts anticipated.  Temporary Bus Stops applied by OC Transpo along Terry Fox where necessary.

Other

  • Access to residents and business are being maintained
  • Ongoing discussions with the BIA
  • Schedule and Traffic impacts are subject to change and are subject to conditions such as weather, material/labour supply and availability, unforeseen items and conditions